Carrier 58ST 11SI Gas Furnace Owners Manual

Product Specification
CategoriesCarrier HVAC Manuals
Document TypeHeating, Ventilating and Air Conditioning Manual Free Download. HAVC Operator's Instruction Manual.
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 45 pages
LanguageEnglish
Product BrandCarrier. Support Phone Number: In North America, please call 1-800-CARRIER for immediate customer assistance from 8:00a -5:00p (EST) weekdays , Heating, Ventilating and Air Conditioning - HVAC
Document File TypePDF
Publishercorp.carrier.com
Wikipedia's PageCarrier Corporation
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

58STA/58STX Induced-Combustion 4-Way Multipoise Furnace Installation, Start-up, Operating, and Service and Maintenance Instructions -Series 100 The 58STA/STX 4-way Multipoise Gas Furnaces feature Carrier’s QuieTech noise reduction system for incredibly quiet induced draft operation. Applications are easy with 4-way multipoise design, through-the-furnace downflow venting, 13 different venting options, and a door designed for easy service access.

An inner blower door is provided for tighter sealing in sensitive applications. The 58STA/STX furnaces are approved for use with natural or propane gas, and the 58STX is also approved for use in Low NOx Air Quality Management Districts. STANDARD FEATURES – QuieTech noise reduction system – Microprocessor based control center Adjustable heating air temperature rise Adjustable cooling airflow LED diagnostics and self test feature – 4-way Multipoise furnace, 13 vent applications – Inner blower door – Hot surface ignition (HSI) – Draft safeguard switch to ensure proper furnace venting – All models are Chimney-Friendly when used with accessory vent kit – Heat pump compatible – Residential installations eligible for consumer financing through the Retail Credit Program – Twinning in Upflow, Downflow and Horizontal LIMITED WARRANTY – 20-year warranty on “Super STM ” heat exchanger – 5-year parts warranty on all other components Catalog No: 535-80105 Form No. 58ST-11SI 12-02 Single-Stage Induced-Combustion 4-Way Multipoise Furnace Installation, Start-up, Operating, and Service and Maintenance Instructions Series 100/A NOTE: Read the entire instruction manual before starting the installation. This symbol indicates a change since the last issue. TABLE OF CONTENTS SAFETY CONSIDERATIONS .2 INTRODUCTION 4 CODES AND STANDARDS 4 Safety .4 General Installation .4 Combustion and Ventilation Air 4 Duct Systems 5 Acoustical Lining and Fibrous Glass Duct 5 Gas Piping and Gas Pipe Pressure Testing 5 Electrical Connections 5 ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS PROCEDURE 5 LOCATION 5 General 5 Location Relative to Cooling Equipment 6 AIR FOR COMBUSTION AND VENTILATION 6 Unconfined Space .7 Confined Space .7 INSTALLATION .8 Upflow Installation .8 Bottom Return Air Inlet 8 Side Return Air Inlet .8 Leveling Legs (If Desired) 8 Downflow Installation 8 Bottom Return Air Inlet 9 Horizontal Installation 9 Suspended Unit Support 9 Platform Unit Support .9 Roll-Out Protection 9 Bottom Return Air Inlet 9 Side Return Air Inlet .9 Filter Arrangement 9 Air Ducts .9 General Requirements .9 Ductwork Acoustical Treatment .11 Supply Air Connections 12 Return Air Connections .13 Gas Piping .13 Electrical Connections 15 115-V Wiring .16 J-Box Relocation .16 Electrical Connection to J-Box .16 For Power Cord Installation 16 For BX Cable Installation .17 For Power Cord Installation 17 Ca rr ier Cancels: II 310A-45-2/IM-PG8J-02 45-3 / IM-PG8J-03 II 310A- EFFICIENCY RATING CERTIFIED Cor pora ti on CERTIFIED SO 900 E R E D F8 3 1 #A28 REGISTERED QUALITY SYSTEM 24-V Wiring .17 Accessories 17 Venting 18 General Venting Requirements .19 Masonry Chimney Requirements 19 Appliance Application Requirements .21 Additional Venting Requirements .21 Sidewall Venting .21 START-UP, ADJUSTMENT, AND SAFETY CHECK 21 General 21 Start-Up Procedures 23 Adjustments .23 Check Safety Controls 29 Checklist

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website