Carrier 58MCA 14SI Gas Furnace Owners Manual

Product Specification
CategoriesCarrier HVAC Manuals
Document TypeHeating, Ventilating and Air Conditioning Manual Free Download. HAVC Operator's Instruction Manual.
Tags
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 48 pages
LanguageEnglish
Product BrandCarrier. Support Phone Number: In North America, please call 1-800-CARRIER for immediate customer assistance from 8:00a -5:00p (EST) weekdays , Heating, Ventilating and Air Conditioning - HVAC
Document File TypePDF
Publishercorp.carrier.com
Wikipedia's PageCarrier Corporation
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

58MCA 4-Way Multipoise Fixed-Capacity Direct-Vent Condensing Gas Furnace Visit www.carrier.com Installation, Start-Up, and Operating Instructions For Sizes 040-140, Series 180 ama A93040 CERTIFIED NOTE: Read the entire instruction manual before starting the installation. This symbol indicates a change since the last issue. Index Page DIMENSIONAL DRAWING 2 SAFETY CONSIDERATIONS .3 Clearances to Combustibles 4 CODES AND STANDARDS 4 ELECTROSTATIC DISCHARGE (ESD) PRECAUTIONS 5 INTRODUCTION 5 APPLICATIONS 6-12 General 6 Upflow Applications 6-7 Downflow Applications .7-9 Horizontal Left (Supply-Air Discharge) Applications .9-10 Horizontal Right (Supply-Air Discharge) Applications .10-12 LOCATION 12-13 General 12 Furnace Location Relative to Cooling Equipment 13 Hazardous Locations .13 INSTALLATION 13-14 Leveling Legs (If Desired) 13-14 Installation In Upflow and Downflow Applications .14 Installation In Horizontal Applications 14 AIR DUCTS 14-19 General 14 Ductwork Acoustical Treatment .16 Supply Air Connections 16-17 Return Air Connections 17 Filter Arrangement 17 Bottom Closure Panel .17 Gas Piping 17-19 ELECTRICAL CONNECTIONS .19-20 115-v Wiring 19-20 24-v Wiring .20 Accessories 20 DIRECT VENTING .20-30 Removal of Existing Furnaces from Common Vent Systems .23 Combustion-Air and Vent Piping .23-29 Concentric Vent and Combustion-Air Termination Kit Installation 29-30 Multiventing and Vent Termination .30 As an ENERGY STARĀ® Partner, Carrier Corporation has determined that this product meets the ENERGY STARĀ® guidelines for energy efficiency.

REGISTERED QUALITY SYSTEM AIRFLOW UPFLOW HORIZONTAL LEFT DOWNFLOW AIRFLOW HORIZONTAL RIGHT AIRFLOW AIRFLOW Fig. 1–Multipoise Orientations A93041 CONDENSATE DRAIN 30-34 General .30-32 Application 32 Condensate Drain Protection .32-34 SEQUENCE OF OPERATION 34-36 Heating Mode 34 Cooling Mode 34-35 Continuous Blower Mode .35 Heat Pump Mode 35 Component Test .35-36 START-UP PROCEDURES 36-44 General 36 Prime Condensate Trap With Water 36 Purge Gas Lines 36 Adjustments .36-44 Set Gas Input Rate 36-44 Set Temperature Rise 44 Adjust Blower Off Delay (Heat Mode) .44 Set Thermostat Heat Anticipator 44 CHECK SAFETY CONTROLS 44 Check Primary Limit Control .

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website